Unitised curtain walls
Facade modules pre-assembled in the workshop and installed floor by floor: the solution for towers and large office buildings when quality and programme matter.
Prefabricate to install faster and better
A unitised facade is made of complete modules (aluminium frame, glazing, opaque panels, gaskets) manufactured and checked in the workshop. On site, modules are lifted, hung from the slabs and interlocked with male-female profiles.
This method greatly reduces installation time on site, limits work on the outside of the facade and ensures consistent quality, since assembly and glazing are done under workshop conditions. It is the standard for high-rise buildings and highly repetitive facades.
Technical sheet
- Standard
- EN 13830 (curtain walling)
- Fabrication
- Modules assembled and glazed in the workshop
- Installation
- From the slabs, by crane or monorail
- Infills
- Glazing, opaque panels, louvres
- Use
- Towers, offices, large repetitive facades
Indicative data, adapted to each project and the selected system.
When to choose unitised
High-rise
Little or no scaffolding: installation from inside the building.
Tight programme
Modules are made during the structural works, then installed very quickly.
Consistent quality
Glazing and sealing done in the workshop and checked before shipping.
Repetitive facade
The more modules repeat, the more cost-effective unitised becomes.
What unitised brings to the site
Fast installation
Several modules per day per team.
Early weathertightness
The building is closed sooner and fit-out trades start earlier.
Less weather risk
Most of the work is done under cover in the workshop.
Performance
Thermal, air and water performance tested on identical modules.
Safety
Installation from the slabs, less external work at height.
Aesthetics
Regular joints and a very precise layout.
From design to handover
Design and layout
Review of specifications, drawings and details; facade layout and choice of systems.
Shop drawings
Technical details, calculations and samples submitted for approval.
Fabrication and QC
Manufacturing of elements and quality control before shipping.
Logistics and installation
Phased deliveries to suit the programme, installed by our teams.
Handover
Inspections, snagging and as-built documentation.
Your questions
What is the difference between unitised and stick system?
With unitised, elements arrive on site as complete pre-assembled modules. With stick, mullions and transoms are assembled piece by piece on site, then glazed.
Is unitised more expensive?
Fabrication costs more, but the time saved on site and repetition often make it competitive on large buildings.
Can you get involved at design stage?
Yes. The earlier we are involved, the better we can optimise layout, structural interfaces and programme.
A facade project to price?
Send us your drawings, specifications and schedule: our team will review your file and come back with an offer.